Skip to content
Pune --:-- IST
StrataNix Engineering
AEC design & BIM partner

StrataNix Engineering

Architecture, engineering and BIM services for owners, designers and contractors worldwide.

Years in practice
7+
Professionals
50+
Clients
200+
01 // Who we are

Who we are

StrataNix Engineering supports the global architecture, engineering and construction industry with specialized design and BIM services: architecture, interiors, landscape, structure and civil, and MEPF, along with BIM consultancy, data centre design and automation. We add value from the earliest design stage through handover to owners and facility managers.

About us
03 // Lifecycle

From tender to handover

Pick a stage to see what we deliver.

Stage 01

Tender

TYPICAL LOD: LOD 100–200
Tender stage diagram

Key deliverables

  • Preliminary 3D models for tender preparation
  • 4D construction animations
  • Quantity estimates
  • Rendered animations
Summary

Preliminary 3D models for tender preparation, 4D construction animations, quantity estimates and rendered animations.

Stage 02

Preconstruction

TYPICAL LOD: LOD 300–400
Preconstruction stage diagram

Key deliverables

  • Architecture, structure and MEPF models from 2D or 3D inputs
  • Trade models up to LOD 400
  • BIM audits for constructability and quantities
  • Laser scan to BIM
  • Federation, clash reporting and resolution
  • Shop, spool and fabrication drawings
  • Rebar coordination
Summary

Architecture, structure and MEPF models from 2D or 3D inputs; trade models up to LOD 400; BIM audits for constructability and quantity extraction; laser scan to BIM; federation, clash reporting and resolution until the model is clash-free; shop, spool and fabrication drawings; rebar coordination.

Stage 03

Construction administration

TYPICAL LOD: LOD 400
Construction administration stage diagram

Key deliverables

  • As-built updates as work progresses
  • Detailed 4D sequencing
  • Planned versus actual progress reporting
Summary

As-built updates as work progresses; detailed 4D sequencing reporting planned versus actual progress.

Stage 04

Quantification

TYPICAL LOD: LOD 300–400
Quantification stage diagram

Key deliverables

  • 5D BIM with quantity metadata
  • Quantity extraction for survey requirements
Summary

5D BIM with enough metadata to extract quantities for survey requirements.

Stage 05

Handover and operations

TYPICAL LOD: LOD 500
Handover and operations stage diagram

Key deliverables

  • Asset information model of as-built elements
  • Aligned to the employer's information requirements
Summary

6D asset management: an asset information model of as-built elements as required by the employer's information requirements.

05 // Work

Selected work

Case studies are being published

Meanwhile, here's what we deliver. We're happy to share sample deliverables on request.

  • 01A large mixed-use scheme coordinated across disciplines
  • 02A BIM implementation and asset management programme
  • 03A design-development model converted from a concept model
  • 04A data centre electrical BIM package
  • 05A scan-to-BIM as-built model
  • 06A landscape model with automated planting
  • 07A structural rebar detailing package
06 // Why us

Why teams choose us

  • Focused AEC experience
  • In-house architecture, structure, MEPF and BIM teams
  • Capabilities beyond modeling
  • Proven scale in complex sectors
  • In-house automation and AI
  • Flexible engagement and repeat clients

Not sure which fits? Build your scope

Start your project with StrataNix Engineering

Tell us about your project. We'll reply with a suggested team, scope and engagement model.

Talk to our team